Published date: 28 January 2025
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Cooling and ventilation equipment - 42500000
Construction work - 45000000
Installation services (except software) - 51000000
PE9 2PY
£35,000
STG/HT/2025
28 January 2025
28 February 2025
5pm
1 May 2025
31 August 2025
Works
Open procedure (below threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements below the relevant contract value threshold.
Yes
Yes
The heating solution across school is via four gas fired Hamworthy boilers, which were installed circa 2011. These are now nearing the end of their economic life.
In addition to aged boilers, one of the circulation pumps has failed meaning that the current heating solution has a single point of failure. Cost of the pump replacement is considered uneconomic given the overall age of the system
Bidders are asked to submit a formal tender for the installation and servicing of a bespoke HVAC solution for all the teaching areas, school hall plus some additional office spaces.
Bidders are to include the ongoing maintenance of the existing suite of HVAC units already on site, along with any new installations as part of this tender.
The mechanical building services works include but are not limited to:
All measurements are approximate
• Supply, delivery and installation of heating/cooling system to main school hall - 145 m2
• Supply, delivery and installation of heating/cooling system to school staff room - 47 m
• Supply, delivery and installation of heating/cooling system to Early Years classroom space - 119 m2
• Supply, delivery and installation of heating/cooling system to 3 xYear 1/2 classrooms space each totalling 52 m2
• Supply, delivery and installation of heating/cooling system to 2 x Year 3/4 classroom spaces each totalling 51m2
• Supply, delivery and installation of heating/cooling system to Headteacher's office - 12m2
• Supply, delivery and installation of heating/cooling system to staff planning room - 12 m2
• Supply, delivery and installation of heating/cooling system to Deputy Headteacher's room - 8m2
• Supply, delivery and installation of heating/cooling system to library - 18m2
In accordance with The Energy Performance of Buildings (Certificates and Inspections) (England & Wales) Regulations 2007 SI 2007/991 amended by SI 2007/1669, SI 2007/3302 and SI 2008/647 there will be a requirement for the existing and new installation to be inspected every 5 years. A current cost for this is to be included in the tender paperwork but will be considered for indicative purposes only.
A maintenance schedule for both the current unitsplus the newly installed units is to be included.
Attachments
Follow the instructions given in the description or the more information section.
Peter Allan
Foundry Road
STAMFORD
PE92PY
England
01780762400
Is there anything wrong with this page?
上一篇:
จ้างเหมาบริการเตรียมแปลงและดูแลพืชทดลอง จำนวน ๑ งาน โดยวิธีเฉพาะเจาะจง下一篇:
Housing Market Assessment (housing needs of specific groups)猜你喜欢
加载中...
广告