加载中...
广告
发布时间 | 所属地区 | 所属机构 | 语言 |
---|---|---|---|
2023年03月07日 | -- | -- | 英语 (English) 中文 |
Short description Old Bawn Community School - Mechanical works to the boilerhouse and heating centre Detailed description This project is an emergency works mechanical project that entails upgrading works to the existing boilerhouse and heating centre for Old Bawn Community School main school building. The works include replacing the existing oil boilers in the boilerhouse with new gas condensing boilers installed in a cascade arrangement, new flues to suit the new boilers, new MCC controls system, new heating services pipework, new gas services pipework, new heating plant, etc. The existing fuel source to the boilerhouse of oil shall be replaced with a new LPG gas supply that shall come from a new LPG gas tank compound which shall be provided as part of this contract. Refer to the Invitation Letter and the documents attached to this advertisement for a detailed description of what works are to be completed. Type of Contract: Works | Contracting authority Old Bawn Community School Old Bawn, Tallaght Co.Dublin Dublin 24 Ireland View profile | Contact Mark Gormley | |
Response deadline
(Irish time)
29-03-2023 13:00 | Currency EUR | ||
CPV codes 45350000-5 Mechanical installations 45351000-2 Mechanical engineering installation works 51100000-3 Installation services of electrical and mechanical equipment 51120000-9 Installation services of mechanical equipment 71333000-1 Mechanical engineering services 71334000-8 Mechanical and electrical engineering services | |||
上一篇:
The 2023 management of a project to protect nesting Little Terns at Kilcoole in Co. Wicklow, by provision of wardening on the site for the duration of tern nesting.下一篇:
Monitoring of Rhododendron in areas of Killarney National Park猜你喜欢
加载中...
广告