加载中...
广告
发布时间 | 所属地区 | 所属机构 | 语言 |
---|---|---|---|
2024年09月24日 | -- | -- | 英语 (English) 中文 |
Published date: 24 September 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Storage tanks - 44611400
Oil-storage tanks - 44611410
Construction work - 45000000
Consultative engineering and construction services - 71310000
Engineering design services - 71320000
GU24 0NF
£25,000 to £30,000
BC22-004 WP6
24 September 2024
1 November 2024
12pm
9 December 2024
28 November 2025
Works
Open procedure (below threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements below the relevant contract value threshold.
Yes
No
The contract is for a single supplier to provide Design and Build of Work Package 6 - Diesel fuel system upgrade and fuel tank replacement, as per the user requirement specification (URS) for The Pirbright Institute (Pirbright), Ash Road, Pirbright, Surrey, GU24 0NF.
The scope of this contract is to replace the Diesel Fuel System to ensure that the ISO 11 incinerator remains available to operate, safe, reliable and will serve the building for a minimum of 10 years.
The scope of works will involve:
• Detailed design work for the new diesel tank system, with all calculations (tank sizing, pump sizing, pipe pressure loss, etc)
• Supply, manufacture, delivery and installation of the new diesel tank system
• Offline commissioning of the new diesel tank system
o It is a requirement that prior to connecting to existing pipework, the new diesel tank system proves that there is the required pressure up to the point of connection.
• During the scheduled shutdown, the new diesel tank system is connected to existing pipework.
• Final commissioning with the burners in operation.
• On completion of commissioning, dismantle, remove and dispose of the existing diesel tank, all ancillaries and any redundant diesel fuel pipework.
• Management of all subcontractors employed by the supplier to complete these works.
• On completion, an O&M is to be submitted which provides details of works from design to completion. The O&M should include all relevant items shown in the PIF and should include all valves/components labelled with a schedule of components included. A separate section which provides details of the following
o Brief Description of the works being carried out.
o Project Risk Assessment.
o Key structural principals.
o Hazardous materials used.
o Information on the future removal of installed plant.
o H&S information about equipment provided for cleaning or maintaining installed plant.
o The nature, location and markings of significant services.
o Information and as built drawings of buildings, plant and equipment.
o Step by step activities to carry out the works.
o Lesson Learnt, challenges met and how they were overcome.
• As part of the works, the supplier should also provide the following:
o Provision to ensure safe access and egress to any confined spaces (Gas monitors, Rescue Personnel, Outside Watchman, etc). This may not be applicable but needs to be considered.
o All provisions for the installation and deconstruction work, including but not limited to:
All necessary machinery and equipment required for the works.
Provision of lighting if needed during winter months
Provision of transport vehicles required for the works which is not listed as part of the CDM site below.
Provision of weather protection for any equipment and materials used/stored outside.
All PPE required for safe working during all works.
Attachments
Additional text
Please note that Appendix H - Confidentiality Agreement must be completed, signed, and emailed to Procurement.Department@pirbright.ac.uk asap. Then and only then will access to the full ITT package (6. Appendix E1 - Site Documents, 6. Appendix E2 - Fuel Sample report and 6. Appendix E3 - Existing Diesel Fuel System Schematic and 6. Appendix E4 - Diesel Tank System Location Map) be granted to the requester.
Follow the instructions given in the description or the more information section.
Is there anything wrong with this page?
上一篇:
Active Treatment Trials - innovative technology and approaches下一篇:
Cambridgeshire County Council SEND Provider Forum 17th October 2024猜你喜欢
加载中...
广告