五洲招标网

五洲招标网
首页 > 英国 > ETFE Roofing C4 - KCSL

加载中...

广告

ETFE Roofing C4 - KCSL

发布时间 所属地区 所属机构 语言
2024年11月04日 -- -- 英语 (English) 中文

Published date: 4 November 2024

Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.

Watch this notice Print this notice
Closing: 11 November 2024, 12pm

Contract summary

Industry

  • Roofing materials - 44112500

  • Location of contract

    London

    Value of contract

    £50,000 to £100,000

    Procurement reference

    C4N87099748

    Published date

    4 November 2024

    Closing date

    11 November 2024

    Closing time

    12pm

    Contract start date

    28 July 2028

    Contract end date

    31 August 2028

    Contract type

    Works

    Contract is suitable for SMEs?

    No

    Contract is suitable for VCSEs?

    No


    Description

    Kilnbridge have secured the HS2 Old Oak Common Station Works Package WP10.2 for construction of the Headhouses and Ancillary Buildings. Part of the scope requires the design, manufacture & installation of an ETFE roofing systems to one of the satellite buildings around the station complex. The ETFE roofing system is part of the scope or works to the building known as the Cycle Hub

    The package consists of an inclined rooflight with stressed single foil membrane which will include :

    - ETFE foil/film
    - Natural in colour with the required acceptable transparency
    - An Extruded Aluminium portal frame / upstand
    - Polyester powder coating finish to the required colour
    - Any pressed Metal components / accessories including gutters flashings, copings, capping reveals etc were required
    - Works include also mock ups, samples and quality benchmarks.

    The specifications and performance requirements included but not limited to are:

    - Architectural & Structural specifications
    - Various roofing and drainage specifications and standards

    The Sub subcontract works includes the provision of all necessary People, Equipment, Plant and Materials for the design, testing, manufacture and installation of the ETFE roof system

    The Subsubcontractor will be responsible for progressing the roof schedule and associated Stage 4 drawings through design for manufacture and installation. This will require submission to, and acceptance from, the Subcontractor, the Contractor's representatives and the Employer to ensure the provided Sub subcontractors design satisfies the intent prior to construction. All in accordance with the Contractors design procedure and technical assistance requirements.

    The scope also includes the design, supply, installation, management and removal of any temporary works required to execute the subsubcontract works and the provision of sufficient temporary protection of the finished roofing systems were required.

    Roof covering circa 180sqm

    Expected Subsubcontract award Q1 2025

    Construction is to be carried out over a 2.5-year period commencing and completed in Q2 2028.


    More information

    Links

  • https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=87099771
  • Tender notice
  • Please follow this link to view the notice.

  • How to apply

    Follow the instructions given in the description or the more information section.


    About the buyer

    Contact name

    Clare Llewellyn

    Address

    McDermott House, South Crescent
    London
    E164TL
    UK

    Telephone

    07933529243

    Email

    supplychain@kilnbridge.com


    Share this notice

    Is there anything wrong with this page?

    温馨提示:本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
    如果您对这篇招标信息有任何补充或修改建议,请告知我们。

    猜你喜欢

    加载中...

    广告