Proposed re Roofing of Original Terminal Building and Ventilation Works
Short description Proposed re Roofing of Original Terminal Building and Ventilation Works Detailed description Removing the existing roof covering on the original Airport Terminal Building.Replace with new roof covering and roof windows, Installation of mechanical ventilation, provide a new high level access to Main Control Tower.
Type of Contract:
Works | Contracting authority Aerphort Idirnáisiúnta Dhún na nGall Teo, T/a Donegal Airport Co. Ltd.
Carrickfinn Kincasslagh Co. Donegal. Ireland
View profile | Contact Padraig Gallagher
www.donegalairport.ie | Response deadline
(Irish time)
26-05-2023 16:00 | Currency EUR | CPV codes 44112500-3
Roofing materials 45261420-4
Waterproofing work 45210000-2
Building construction work 45213331-2
Airport buildings construction work 39563530-0
Ventilation ducting 42500000-1
Cooling and ventilation equipment 42520000-7
Ventilation equipment 45331210-1
Ventilation installation work
| |
|
温馨提示:本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
猜你喜欢