Heating Centre Full Heating Upgrade
Short description EWS 2023 - Holy Child BNS -
Heating Centre & Full Heating Upgrade Detailed description • Supply and installation of the 2no. new gas condensing boilers (1no. bolier on site shall be reused) in the boilerhouse. • Supply and installation of new flue to suit the new gas boiler. • Provide new MCC controls panel. • Supply and installation of new variable speed energy efficient heating pumps. • Decommission and replace the majority pipework in the boilerhouse. • Supply and installation of new heating services and water services pipework in the boilerhouse to suit the new arrangement. Refer to drawings and specifications for further information. • All associated preliminaries for the project. • All associated decommissioning works. • All associated electrical works as indicated on the drawings and detailed in the specifications. • All builders’ works associated with the above. | Contracting authority Holy Child Boys' National School
Larkhill Road, Whitehall Co.Dublin Dublin 9 Ireland
View profile | Contact Gerd Benndorf
| Response deadline
(Irish time)
15-05-2023 13:00 | Currency EUR | Main CPV code 45232141-2
Heating works | CPV codes 39715200-9
Heating equipment 39715210-2
Central-heating equipment 44620000-2
Central-heating radiators and boilers and parts 44621220-7
Central-heating boilers
| |
|
温馨提示:本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
如果您对这篇招标信息有任何补充或修改建议,请告知我们。
猜你喜欢