Works to The Tye Footpath

发布时间 所属地区 所属机构 语言
2024年10月09日 -- -- 英语 (English) 中文

Published date: 9 October 2024

Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.

Watch this notice Print this notice
Closing: 1 December 2024, 5pm

Contract summary

Industry

  • Macadam, tarmac and tar sands - 14213000

  • Location of contract

    CM3 8AF

    Value of contract

    £20,000

    Procurement reference

    Tye Footpath

    Published date

    9 October 2024

    Closing date

    1 December 2024

    Closing time

    5pm

    Contract start date

    1 January 2025

    Contract end date

    1 July 2025

    Contract type

    Works

    Procedure type

    Open procedure (above threshold)

    What is an open procedure (above threshold)?

    Any interested supplier may submit a tender in response to an opportunity notice.

    This procedure can be used for procurements above the relevant contract value threshold.

    Contract is suitable for SMEs?

    Yes

    Contract is suitable for VCSEs?

    No


    Description

    Demolition Specification
    Excavate existing footpath & ground to a depth of 160mm; remove all redundant material from site and dispose. Contractor to agree site measurement with Council representative and document prior to submission.
    The Works
    Phase 1
    Carry out demolition as specified. Lay new footpath; 1.2 meter wide between edgings x 111 meter long to North end of the Tye. Composite edging bedded on and haunched back & front with concrete. Every care must be taken in relation to levels; the contractor must account for water escape from the finished surface and any adjoining hard surfaces.

    Phase 2
    Carry out demolition as specified. Lay new footpath; 1.2 meter wide between edgings x 119 meter long to South end of the Tye. Composite edging bedded on and haunched back & front with concrete. Every care must be taken in relation to levels; the contractor must account for water escape from the finished surface and any adjoining hard surfaces.

    Specification/Notes

    Include all site safety barriers for public, maintain public access throughout works. Ensure public Health & Safety during works.
    Install weed preventative and weight stabilising membrane to all new works; lay 100mm certified MOT type 1 crushed limestone or equivalent, machine roll.

    Adjust all manhole chambers, water/gas stop tap boxes etc in height to new finished surfaced pathway

    Lay to total area 40mm 0f 20mm binder course tarmacadam and 20mm 0f 6mm surface course tarmacadam and machine roll.

    Tar any joints with hot poured bitumen to seal where new surface meets surrounding surface.

    Clear away and make good on completion

    Note:
    Please provide a price for each Phase as a separate works package including all associated set up costs.
    In the event that both Phase 1 & 2 are carried out concurrently please provide your discount for the combined works on the collection sheet


    More information

    Attachments

  • The Tye Path Works 02-05-24v3.xls.pdf
  • Tender notice

  • How to apply

    Follow the instructions given in the description or the more information section.


    About the buyer

    Contact name

    Lucy White

    Address

    Coronation Cottage
    The Street
    Chelmsford
    CM38RQ
    England

    Telephone

    07703170512

    Email

    clerk@easthanningfield-pc.gov.uk


    Share this notice

    Is there anything wrong with this page?

    温馨提示:本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
    如果您对这篇招标信息有任何补充或修改建议,请告知我们。

    猜你喜欢

    加载中...

    广告