Published date: 6 June 2024
Last edited date: 2 July 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Watch this notice
Print this notice
Closing: 16 July 2024, 11:59pm
Contract summary
Industry
Construction work - 45000000
Location of contract
England
Value of contract
£3,750,000
Procurement reference
GLOSCC001-DN722873-63268655
Published date
6 June 2024
Closing date
16 July 2024
Closing time
11:59pm
Contract start date
9 September 2024
Contract end date
15 August 2025
Contract type
Works
Procedure type
Open procedure (below threshold)
What is an open procedure (below threshold)?
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements below the relevant contract value threshold.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
This advert is intended to notify potential suppliers of the tender for the A435 Cycleway Section 2.1 & Wellington Road scheme.
The A435 Cycleway Section 2.1 works are located between the GWSR Bridge and Bishop's Cleeve roundabout, with the Wellington Road works located between Wellington Road and Central Cross Drive.
The works are located at two distinct sites. The first site, A435 Cycleway Section 2.1, is located north of the GWSR Bridge (approx. post code GL50 4SH) to Bishops Cleeve Roundabout (approx. post code GL52 8SF), and the second site, Wellington Road, located from Wellington Road Junction (approx. post code GL52 2AH) to Central Cross Drive junction (approx. post code GL52 2AH). This scheme is part of a wider strategic scheme to boost active travel provision within the county, through the creation of the Gloucestershire Cycle Spine. The overall scheme will implement a continuous cycleway for cyclists of all ages and abilities between the main hubs of Bishops Cleeve, Cheltenham, Gloucester, Haresfield and Stroud. In addition, this scheme will also install a section of sheet piling along the A435, which shall improve embankment stability and reduce continuous carriageway cracking.
The client is looking for a Principal Contractor to deliver the construction phase of this scheme.
Summary of Construction Phase key deliverables are as follows:
Provide suitable Traffic Management during the construction works.
Pedestrian access to residents always during the construction works.
Utility diversion works (arranged by GCC for PC to liaise/accommodate).
New drainage works and tie-in to existing.
A mixture of Highway, segregated footway / cycleway track and new shared use path construction.
Junction and carriageway realignments.
New traffic signals facilities across the route.
Streetlighting column installation and relocation.
Sheet piling installation along the A435 for 160m.
A summary of the outline programme is shown below:
Tender return: 16th July 2024
Award: Friday 9th August 2024
Anticipated Works Start Date: 9th September 2024
Completion: 15th August 2025
Overall Duration: 39 weeks
Indicative Value: £3.75m (£4.5m including VAT)
The proposed procurement route will be a single stage (Open Procedure) using the NEC4 ECC form of Contract, Option A Priced Contract with Activity Schedule.
Full details will be available in the tender pack om Procontract.
https://procontract.due-north.com/Advert?advertId=f2a5e8b6-9d0c-ef11-812b-005056b64545&p=696a9836-1895-e511-8105-000c29c9ba21
How to apply
Follow the instructions given in the description or the more information section.