加载中...
广告
发布时间 | 所属地区 | 所属机构 | 语言 |
---|---|---|---|
2025年01月16日 | -- | -- | 英语 (English) 中文 |
Published date: 16 January 2025
Open early engagement - This means that a procurement idea is currently active, it is in the early stage of development and judging interest from potential suppliers.
Sliding doors - 44221230
Garage doors - 44221240
Maintenance hangar construction work - 45213351
Marine construction works - 45244000
Dry docks construction work - 45248200
Roof works and other special trade construction works - 45260000
TR18 4BW
BUS003_0081_1.7
16 January 2025
3 February 2025
Yes
No
Penzance Dry Dock (PDD) is famously steeped in history, currently being the oldest operational dry dock of its type in Europe but requires drastic investment after decades of neglect and dilapidations. While the surrounding shipyards, across the county and country have seen investment, PDD has slipped through the net time and time again.
PDD plans to complete a large refit by March 2025. PDD will become the engineering powerhouse that it once was, but with more abilities than ever before.
This facility has primally been ship repair only, but now we are supporting multiple areas of the market, ship repair, ship building, mass fabrication and most importantly training and skill development.
This capital investment, part-funded by the UK Government through the UK Shared Prosperity Fund, will see the site brought up to an even playing field with the rest of industry, with new, safer lifting systems and the dilapidations being rectified. We will see our efficiency drastically increased which in turn will assist in reducing our carbon footprint.
Penzance Dry Docks is seeking the design, manufacture, supply and installation of industrial/ commercial bi-fold doors onsite to Penzance Dry Dock.
Attachments
Follow the instructions given in the description or the more information section.
Jackie George
St. Denys House
ST. AUSTELL
PL254TR
England
Is there anything wrong with this page?
上一篇:
ประกาศแผนการจัดจ้างเหมาบริการวงจรอินเทอร์เน็ต ประจำปีงบประมาณ พ.ศ. 2567下一篇:
จ้างเหมาจัดทำแบบสอบสัมภาษณ์การศึกษาห่วงโซ่การผลิตมะพร้าวน้ำหอม จำนวน ๑ งาน โดยวิธีเฉพาะเจาะจง猜你喜欢
加载中...
广告