加载中...
广告
发布时间 | 所属地区 | 所属机构 | 语言 |
---|---|---|---|
2024年11月13日 | -- | -- | 英语 (English) 中文 |
Published date: 13 November 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Construction equipment - 43320000
Construction structures and materials; auxiliary products to construction (except electric apparatus) - 44000000
Any region
£100,000 to £150,000
C4N87443335
13 November 2024
21 November 2024
6pm
1 April 2025
31 December 2026
Supply contract
No
No
The present report aims to clarify the geometrical construction tolerances required in the
construction of the Precast Segmental Viaducts. It applies to all components that constitute the said
assets and should be implemented in design and construction.
The list of assets to which this document applies to is as follows:
- Water Orton 1 and 2 Viaducts
- River Tame West Single Track
- River Tame West Double Track Viaduct
- River Tame East Viaduct
Links
Follow the instructions given in the description or the more information section.
Bijalbes Desai
Water Orton Central, Watton Lane,
Water Orton
B461PA
UK
+447743984129
Is there anything wrong with this page?
上一篇:
Supply Distribution of Amb/Chill/Froz, Snacks Conf Soft Drinks and Fruit Veg (inc. Dairy) to Education Partnership North East下一篇:
SBRI Competition Fusion Industry Challenges - Novel Concepts for Robust Diagnostics Systems, Sensing and Control猜你喜欢
加载中...
广告