Published date: 31 October 2024
Open future opportunity - This means that the buyer is not yet ready to invite bid applications but early notification has been provided and some dialogue may be possible.
Construction structures and materials; auxiliary products to construction (except electric apparatus) - 44000000
SG12 9AL
£40,000 to £60,000
Fletcher's Lea Internal Refurbishment Project
31 October 2024
25 November 2024
2 January 2025
24 February 2025
Open procedure (below threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements below the relevant contract value threshold.
Yes
No
To renovate Fletcher's Lea to agreed specifications including new toilet design, improvement of the bar, foyer and main room areas.
Fletcher's Lea is a multipurpose space that serves high end guests attending weddings, celebrations and conferences but also provides a setting for a variety of events for the community of Ware. The aspiration is to improve the current facilities so that it is desirable to all clientele whilst being functional and efficient for every use.
In general access to Fletcher's Lea will be Monday to Friday from 8am until 8pm. If work is required to be undertaken over the weekend, this can be arranged with the Sales and Operations Manager.
Ware Priory is operational with commercial and charity events at various times. Coordination with the Sales and Operations Manager will be required as it may be necessary that no work is carried out should it be deemed to cause disruption to private events on the Priory estate.
Detailed Specification of Fletcher's Lea Internal
Refurbishment Project
Toilets
• Update to modern specification on a like for like basis
• Possibility of reducing ladies stalls from 4 to 3....
• Replace the current stalls and white goods in line with the toilets in the main Ware Priory building
• Replace the appointments (soap dispensers, dryers etc) as per above.
Essential Sustainability Work
• The addition of hot water distribution taps in toilets, kitchen and bar to reduce all taps to 5.7 litres/minute. This will reduce HW demand and ASHP size plus meet ESG directives.
• The installation of a Hot Water Cylinder Heat Pump. Switch the direct electric hot water system to a hot water cylinder heat pump such as the Dimplex EDL or Daikin Altherma with SCOP min 2.7. This then provides renewable hot water. Short ductwork needed to external wall/roof.
Main Room
• To submit a design for a multi-purpose facility including items below
• Wall Spaces - add mirror in large space on the right hand side as you enter the room
• Provide choice of vinyl rendering for the storage / door panelling to match the bar area
• Replacement of curtains with black out curtains or blinds to suit the design element.
Reception
• Repaint or stylish vinyl covering or bar panelling - to match with main room storage doors (see above)
• Area Between Bar Corridor and Foyer
• Replace shelf with something more durable
• Box in area below
• Splash backs for area above
• Clean up sink
Kitchen
• Removal of excess equipment including safe and current storage units
• To be replaced with closed in cupboard storage
• Wall space needs redecorating and plastic cornering added to protect from scuffing
• Replacement of gas hob for electric one.
Bar
• New design and some functional improvements including:-
• Mirrored back walls
• Silver / chrome shelving above fridges
• Re-decorate flooring and lower wall area by the glass washer and sinks.
Financial year | Budget |
---|---|
2024/2025 | £40,000 |
Attachments
Follow the instructions given in the description or the more information section.
KERRY MAVRIS
The Priory
WARE
SG129AL
England
01920460316