Published date: 7 January 2025
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Solar energy - 09330000
Solar installation - 09332000
Wind-energy generators - 31121300
Battery packs - 31422000
Electrical equipment and apparatus - 31600000
Civil engineering machinery - 43310000
Works for complete or part construction and civil engineering work - 45200000
Civil engineering support services - 71311100
Energy and related services - 71314000
Any region
£5,000,000 to £10,000,000
C4N89278941
7 January 2025
24 January 2025
3:11pm
5 May 2025
7 January 2026
Works
Yes
No
Fluence Energy (A Siemens and AES Company) have an exciting BoP EPC project pipeline for 2025. Fluence are working with some fantastic new and existing customers, helping them to deliver comprehensive turnkey Battery Energy Storage Solutions (BESS).
We are looking to contract with Balance of Plant (BoP) Civil and Electrical contractors to deliver an initial pipeline of 3 projects. All three projects are Turnkey and located within UK & Ireland. The Specific areas of these projects are in close proximity to: East Ayrshire (Scotland), Greater Manchester (England) and Dublin (Ireland).
Typical BoP scope activities includes (but not limited to):
Preliminaries:
Project & Site Management
Design & Engineering Management
Electrical System Studies
Site Setup
Civil Works:
Enabling Works
Setting out and surveys
HSE, site infrastructure and CDM compliance
Temporary works requirements
Establish Finished platform
Piling
Drainage works
Ducting and troughing installation
Installation of equipment bases
Control Room Installation
Equipment lifting
Landscaping
Electrical Works:
Lightning Protection, earthing, bonding
Supply & install of switchboards
Supply & Install cables including terminations
Supply & Install Auxiliar Transformers
Supply & Install Containerised Building/Control Room/s
Control & Protection Panels & Wiring
Supply & Install BESS External Lighting
Supply & Install BESS CCTV System (optional)
Supply & Install DC Systems (Containerised Building) (Optional)
Installation of Fire Alarm Panels (including wiring )
BESS - Offloading, Positioning & Installation of Battery Enclosures
BESS - Cooling Liquid filling of Battery Enclosures
BESS - Offloading, Positioning & Installation of Power Conversion Systems
BESS - Offloading, Positioning & Installation of Core Transformers
BESS - Offloading, Positioning & Installation of Core Support Enclosures
BESS - Offloading, Positioning & Installation of Core Auxiliary Power Panel
BESS - Supply & Installation of Cables in all Battery Nodes
BESS - Supply & Installation of Communication Cables
BESS - Supply & Installation of Auxiliary Power Cables
BESS - Supply & Installation of All Cables from BESS PEC Unit to IPP Customer Control Building
BESS - Supply & Installation of Auxiliary F-Stop Cables
BESS - Supply & Installation of Fire Alarm System Cables
Test & Commissioning:
Test & Commissioning Containerised Building (Switchgear, LV AC & DC, Fire, C&P and FO Cables)
Quality Assurance Documentation
Links
Follow the instructions given in the description or the more information section.
Matthew Cemm
3rd Floor, Exmouth House, 3-11 Pine Street
London
EC1R 0JH
UK
07891367141
Is there anything wrong with this page?
上一篇:
ประกาศประกวดราคาซื้อรายการ ชุดเครื่องมือสำรวจพิกัดด้วยสัญญาณดาวเทียมและโมเดล 3 มิติ ในงานวิศวกรรมโยธา จำนวน 1 ชุด ด้วยวิธีประกวดราคาอิเล็กทรอนิกส์ (e-bidding)text下一篇:
จ้างOrganizer สำหรับพิธีทูลเกล้าฯ ถวายฉลองพระองค์ครุยพระบรมราชูปถัมภกและทอดพระเนตรการแสดงดนตรีเฉลิมพระเกียรติ เนื่องในโอกาสพระราชพิธีมหามงคลเฉลิมพระชนมพรรษา ๖ รอบ จำนวน ๑ งาน โดยวิธีเฉพาะเจาะจง猜你喜欢
加载中...
广告