加载中...
广告
发布时间 | 所属地区 | 所属机构 | 语言 |
---|---|---|---|
2025年01月21日 | -- | -- | 英语 (English) 中文 |
Published date: 20 January 2025
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Repair and maintenance services - 50000000
TW13 7EF
£6,000
AIRCON
20 January 2025
31 January 2025
10am
10 February 2025
9 February 2028
Service contract
Competitive quotation (below threshold)
The buyer selects a group of potential suppliers to invite to tender.
This procedure can be used for procurements below the relevant contract value threshold.
Yes
No
Annual maintenance contract for the various air conditioning systems at Tudor Park Education trust.
Maintenance Agreement to consist of
REFRIGERANT CIRCUIT / CONDENSER SECTION
CHECK CONDITION AND CLEAN CONDENSER COIL.
CHECK CONDENSER FAN MOTOR OPERATION AND CONDITION.
CHECK MAINS POWER AND CONTROL WIRING CONDITION.
CHECK SIGHT GLASS MOISTURE INDICATOR AND CONDITION.
CHECK PIPEWORK AND CIRCUIT FOR SIGNS OF REFRIGERANT LEAKS.
REPORT ALL SYSTEM OPERATING FAULTS AND/OR PROBLEMS.
CHECK COMPRESSOR OPERATION AND RECORD RUN AMPS.
CHECK AND RECORD COMPRESSOR SUCTION PRESSURE.
CHECK AND RECORD COMPRESSOR DISCHARGE PRESSURE.
CHECK CRANKCASE HEATER OPERATION AND CONDITION.
RECORD CONDENSER COIL TEMPERATURE DIFFERENCE.
CHECK SAFETY DEVICE CONDITION, OPERATION AND SETTINGS.
CHECK HEAD PRESSURE CONTROL DEVICE OPERATION AND SETTINGS.
CHECK EXPANSION DEVICE OPERATION.
EVAPORATOR / FAN COIL SECTION
CHECK EVAPORATOR FAN MOTOR AND BLADES FOR OPERATION.
CLEAN/CHANGE AIR FILTER, PRE FILTER (MINOR CHANGE).
CHECK MAINS POWER AND CONTROL WIRING CONDITION.
CHECK CONTROLLER OPERATION AND RECORD TEMPERATURE SETPOINT.
CHECK ELECTRIC HEATER OPERATION AND CONDITION.
CHECK/CLEAN DRIP TRAY, CONDENSE PUMP AND PIPEWORK.
CLEAN INTERNAL, EXTERNAL SURFACES AND GRILLE INLET SCREENS.
REPORT ALL SYSTEM OPERATING FAULTS AND PROBLEMS.
CLEAN/CHANGE AIR FILTER, PRE AND BAG FILTER (MAJOR CHANGE).
CHECK/CHANGE FAN DRIVE BELT AND CHECK DRIVE COMPONENTS.
CHECK CONDITION AND CLEAN EVAPORATOR COIL.
CHECK AND RECORD EVAPORATOR ON COIL TEMPERATURE.
CHECK AND RECORD EVAPORATOR COOLING OFF COIL TEMPERATURE.
A full asset list of plant on site is including in the attachments
To apply please send email quotations
Attachments
Follow the instructions given in the description or the more information section.
Sharon Knowles
Tudor Park Education Trust
Browell's Lane
Feltham
TW13 7EF
England
020 8831 3053
Is there anything wrong with this page?
上一篇:
Equipment Maintenance for Contrast Injectors Rapid Infusers Reference: ST24-P351下一篇:
Bournemouth Pier Structural Works猜你喜欢
加载中...
广告