加载中...
广告
发布时间 | 所属地区 | 所属机构 | 语言 |
---|---|---|---|
2024年12月02日 | -- | -- | 英语 (English) 中文 |
Published date: 2 December 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Environmental impact assessment for construction - 71313400
Environmental Impact Assessment (EIA) services for construction - 71313440
Environmental monitoring for construction - 71313450
Endangered species protection services - 90721700
East Midlands
£9,999
048.00 - Ecology Surveys
2 December 2024
13 December 2024
5pm
1 March 2025
31 December 2025
Works
Competitive quotation (below threshold)
The buyer selects a group of potential suppliers to invite to tender.
This procedure can be used for procurements below the relevant contract value threshold.
Yes
No
The A46 Newark Bypass is a complex major infrastructure improvement scheme being developed by National Highways to widen the A46 to dual carriageway from the Farndon Roundabout to the Winthorpe Roundabout.
The A46 Newark Bypass scheme requires ecology revalidation surveys prior to entering construction of the scheme to determine the presence/absence of species within and adjacent to the Order Limits. The following surveys are required and will require the applicant to arrange landowner access and to provide recommendations for further survey and completion of reports upon completion of each species-specific surveys.
• Bat Survey (aerial, emergence/re-entry (inc. trees and buildings), transects, statics, hibernation)
• Badger Survey
• GCN Survey (HSI, eDNA, presence/absence)
• Otter Survey (habitat assessment and field signs)
• Reptile survey (presence/absence)
• Water vole survey (habitat assessment and field signs)
• Wintering bird survey
• Breeding bird survey
• Barn owl survey (pre-commencement survey for closure of nest sites)
• Aquatic invertebrate survey (PSYM, rapid pond, riverine, ditch macroinvertebrate)
• Terrestrial invertebrate survey
• River physical habitat survey (river habitat, ditch condition assessment, river condition assessment)
• Botanical surveys (extended phase 1, condition assessment, NVC)
• Desk study (NBGRC, BTO Report)
Attachments
Additional text
If you would like to register your interest in this opportunity, please complete the attached Expression of Interest form and email to tom.goodwin@skanska.co.uk
Please ensure your email subject contains the reference 0048.00 - Ecology Surveys.
Please also include the requested attachments, including company brochure, case studues of similar works, and any Common Assessment Standard (CAS) Certificates for prequalification.
Responses received shall be reviewed and shortlisted for inclusion in the formal tender of these works.
Follow the instructions given in the description or the more information section.
Tom Goodwin
1 Hercules Way
WATFORD
WD39SW
England
https://nationalhighways.co.uk/our-roads/east-midlands/a46-newark-bypass/
Is there anything wrong with this page?
上一篇:
Healthwatch Blackpool下一篇:
Bradbourne Re-bourne (Bradbourne Lakes) - Lead Consultant / Landscape Architect猜你喜欢
加载中...
广告