加载中...
广告
发布时间 | 所属地区 | 所属机构 | 语言 |
---|---|---|---|
2025年01月13日 | -- | -- | 英语 (English) 中文 |
Published date: 13 January 2025
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Heating works - 45232141
Construction works for power plants and heating plants - 45251000
Heating plant construction work - 45251200
Other sources of energy supplies and distribution - 65400000
Energy and related services - 71314000
PO1 3LS
£3,500,000
20250113094119-153032
13 January 2025
17 February 2025
3pm
1 September 2025
31 August 2026
Works
Restricted procedure
A two-stage procedure, where the first stage is used to select suppliers, who are then invited to bid in the second stage.
No
No
1. General Description Organic Rankine Cycle (ORC) system designed to generate electricity from low-temperature waste heat sources. Its should be capable of operating continuously or intermittently with a CHP engine. 2. Technical Specifications • Net Power Output: 200 - 400 kW per unit • Thermal Power Absorbed: 1000 - 4500 kW • Hot Water Temperature: Minimum 80°C • Working Media: Environmentally friendly, non-toxic, non-flammable • Control System: PLC system / MODBUS TCP
Links
Follow the instructions given in the description or the more information section.
Dan Jackson
Victory Building, Room 233, The Parade, HM Naval Base
Portsmouth
PO1 3LS
ENG
Is there anything wrong with this page?
上一篇:
Provision of Public Toilet Refurbishment下一篇:
จ้างซ่อมกล้องโทรทัศน์ ยี่ห้อ Grass Valley รุ่น LDX 5650 หมายเลขเครื่อง 3FMYM พร้อมเปลี่ยนอะหล่ (2 รายการ) จำนวน 1 งาน猜你喜欢
加载中...
广告