加载中...
广告
发布时间 | 所属地区 | 所属机构 | 语言 |
---|---|---|---|
2024年06月25日 | -- | -- | 英语 (English) 中文 |
Published date: 25 June 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Lightning-protection works - 45312310
Any region
£50,000 to £100,000
C4N81813929
25 June 2024
30 June 2024
10:15am
7 July 2024
27 June 2025
Works
Yes
No
To undertakes the design, procurement, delivery, off-loading installation, testing, setting to work, commissioning, assurance, maintenance and handover of Westgate ventilation shaft lightning protection works as further described within this information
To install a complete and compliant lightning protection installation in line with the project specifications including (but not limited to) the following:
• Installation of earth tapes on the head house and connections to the earthing system as per the contract drawings and earthing schematics.
• Installation of test pits and earthing rods as detailed in the design drawings.
• Fixing of earth tapes and connections of tapes and cables as per design drawings
• Connection to earthing networks / systems installed by others.
• Any labelling required for tapes and cables
• Testing of earth bars and cabling
To undertake a lightning protection risk assessment in accordance with the requirements set out within BS EN 62305, the lighting protection risk assessment shall
recognise the potentially high economic losses associated with the loss of the ventilation and
intervention shaft or firefighting point.
To use conductor tapes, running down the exterior of the building to separate earth rods, in preference to using structural steelwork where practicable to minimise the risk to sensitive equipment.
To ensures that all cables running externally shall make as much use as practicable of natural shielding from fully bonded conducting materials.
To assesses the lightning protection system for the incorporation of air termination networks on the roof and identify that best composition.
To provide test joints for all down and earthing conductors and will be located in inspection pits adjacent to the above ground building foundations.
To install surge protection devices for all cables passing through the lightning protection system and be class I type where cables enter and leave the building at roof level, conforming to IC 61643-12.
To install class III type conforming to IC 61643-12 where cables enter and leave the building at ground level surge protection devices.
To provides suitable warranties in line with industry standards.
Links
Follow the instructions given in the description or the more information section.
Maryam Abdussalam
25 Camperdown Street
London
E18DZ
UK
+447500440686
Is there anything wrong with this page?
上一篇:
Tree Maintenance - Reactive - Tree Maintenance - Reactive - Highways下一篇:
Manual Milling Machines - 2024 - Reissue猜你喜欢
加载中...
广告