ISO 11 Incinerator Life Extension Project - WP10 Hydraulic System Replacement Project

发布时间 所属地区 所属机构 语言
2024年10月31日 -- -- 英语 (English) 中文
抱歉,该信息暂无中文翻译信息,为您显示项目原文信息。

Published date: 31 October 2024

Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.

Watch this notice Print this notice
Closing: 13 December 2024, 12pm

Contract summary

Industry

  • Hydraulic or pneumatic power engines and motors - 42121000

  • Hydraulic power packs - 42122210

  • Waste incinerators - 42320000

  • Show additional CPV codes for this notice
  • Consultative engineering and construction services - 71310000

  • Engineering design services - 71320000

  • Location of contract

    GU24 0NF

    Value of contract

    £45,000 to £50,000

    Procurement reference

    BC22-004 WP10

    Published date

    31 October 2024

    Closing date

    13 December 2024

    Closing time

    12pm

    Contract start date

    3 February 2025

    Contract end date

    28 November 2025

    Contract type

    Works

    Procedure type

    Open procedure (below threshold)

    What is an open procedure (below threshold)?

    Any interested supplier may submit a tender in response to an opportunity notice.

    This procedure can be used for procurements below the relevant contract value threshold.

    Contract is suitable for SMEs?

    Yes

    Contract is suitable for VCSEs?

    No


    Description

    The scope of works will involve:

    • Detailed design work for the hydraulic system, with all calculations (tank sizing, pump sizing, pipe pressure loss, etc)
    • Supply, manufacture, delivery and installation of the hydraulic system
    • Overhaul of existing hydraulic rams
    • Remove the existing hydraulic system and drain all oil into suitable containers.
    • Install the new hydraulic system and connect to the overhauled rams
    • Commissioning of hydraulic system in isolation of the control panel.
    • Final commissioning with the control panel providing the enabling/disabling signals.
    • During the works, the existing hydraulic system and drained oil will remain in the loading hall area. The site team will arrange for this to be taken outside of containment. However, the supplier is to allow costs for:
    o Draining all oil from the hydraulic system into suitable containers
    o Dismantling the existing hydraulic system so it can be taken out of the fire door (approx. 900mm wide)
    o Lift and shift of all items outside of biocontainment
    o Disposal of existing hydraulic system and provide all waste certification to the Client Project Manager
    • Management of all subcontractors employed by the supplier to complete these works.
    • On completion, an O&M is to be submitted which provides details of works from design to completion. The O&M should include all relevant items shown in the PIF and should include all valves/components labelled with a schedule of components included. A separate section which provides details of the following
    o Brief Description of the works being carried out.
    o Project Risk Assessment.
    o Key structural principals.
    o Hazardous materials used.
    o Information on the future removal of installed plant.
    o H&S information about equipment provided for cleaning or maintaining installed plant.
    o The nature, location and markings of significant services.
    o Information and as built drawings of buildings, plant and equipment.
    o Step by step activities to carry out the works.
    o Lesson Learnt, challenges met and how they were overcome.
    • As part of the works, the supplier should also provide the following:
    o All provisions for the installation and deconstruction work, including but not limited to:
     All necessary machinery and equipment required for the works.
     Provision of lighting if needed during winter months
     Provision of transport vehicles required for the works which is not listed as part of the CDM site below.
     Provision of weather protection for any equipment and materials used/stored outside.
     All PPE required for safe working during all works.
    A CDM Construction site will be set up as part of the overall project which will provide for the following:
    • Site Supervision
    • HERRAS fencing and appropriate signage around CDM area
    • Site Office
    • Welfare Office including changing areas
    • Waste skips
    • Scissor lift
    • Fork-lift truck / telehandler
    • CDM documentation / inductions / daily logs / management of RAMS


    More information

    Attachments

  • 1. ITT - WP10 Hydraulic System Replacement Project.docx
  • Bidding documents
  • 2. Appendix A - Supplier Pre-Qualification Questionnaire.docx
  • Bid submission documents
  • 3. Appendix B - Scoring Matrix V1.xlsx
  • Evaluation criteria
  • 4. Appendix C - Pricing Schedule.xlsx
  • Bid submission documents
  • 5. Appendix D - NEC4 ECC OpA Contract Data.docx
  • Contract draft
  • 6. Appendix E - WP10 Hydraulic System Replacement Project.docx
  • Technical specifications
  • 7. Appendix F - Form of Offer.docx
  • Bid submission documents
  • 8. Appendix G - The Pirbright Institutes use of animals in research.pdf
  • Bidding documents
  • 9. Appendix H - Confidentiality Agreement.docx
  • Bidding documents
  • Additional text

    Please note that Appendix H - Confidentiality Agreement must be fully completed, signed, PDFed and emailed to Procurement.Department@pirbright.ac.uk asap. Then and only then will access to the full ITT package (6. Appendix E1 - Site Documents & 6. Appendix E2 - Existing Hydraulic System O&M) be granted to the requester.


    How to apply

    Follow the instructions given in the description or the more information section.


    About the buyer

    Address

    Pirbright
    WOKING
    GU240NF
    England

    Email

    Procurement.Department@pirbright.ac.uk


    Share this notice

    Is there anything wrong with this page?

    温馨提示:本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
    如果您对这篇招标信息有任何补充或修改建议,请告知我们。

    猜你喜欢

    加载中...

    广告