加载中...
广告
发布时间 | 所属地区 | 所属机构 | 语言 |
---|---|---|---|
2024年11月12日 | -- | -- | 英语 (English) 中文 |
Published date: 12 November 2024
Open early engagement - This means that a procurement idea is currently active, it is in the early stage of development and judging interest from potential suppliers.
Radio, television, communication, telecommunication and related equipment - 32000000
England
CAMBDC001-DN751741-90079785
12 November 2024
19 November 2024
Yes
No
Cambridge City Council is seeking suppliers to supply and install the following:
• Installation of wired lighting bars with connections for power, DMX and XLR.
• A small range of lighting fixtures to include profiles, washes and moving heads
• Lighting controller
• All fittings and connecting cables
• Digital audio desk and stage box
• Speakers and amplifiers
• Stage mics
• Stage monitors
• Mic stands, DIs and cables
• Flight cases for the audio desk, lighting controller and a road trunk for mics, cables and stands
• Any additional wall sockets and wiring
The equipment will be installed at Clay Farm Centre - a large community centre in Trumpington, Cambridge which encompasses a library, café area, dance studio, various meeting rooms, a large hall, a large Doctors Surgery on the second floor, and 20 residential apartments over the third and fourth floors. The hall is 250 seated/400 standing with raked seating, sprung floor, projector, screen and small PA.
If you are interested for this upcoming opportunity, please express your interest by 12 pm of the 19th of November 2024. Please include a description and equipment list of your proposed solution.
Follow the instructions given in the description or the more information section.
Jonathan Loneza
Cambridge City Council
Guildhall
Cambridge
CB2 3QJ
England
+44 1223457107
Is there anything wrong with this page?
上一篇:
Création d'une voirie interne et extension des réseaux divers au droit de la nouvelle école maternelle Comportant 2 phases d'exécution : - Phase 1 : Création des réseaux divers et assainissement - Phase 2 : Travaux de réalisation de chaussée, borduration, pavage, finition.... Chaque phase a une durée de réalisation de 30 jours Date prévisionnelle des travaux: - Phase 1 : 15 janvier au 15 février 2025 - Phase 2 : Mai 2025 Une visite du lieu est prévue le jeudi 21 novembre soit à 11h30 ou à 13h30. Visite sur rendez-vous.下一篇:
The Unionist Club猜你喜欢
加载中...
广告