加载中...
广告
发布时间 | 所属地区 | 所属机构 | 语言 |
---|---|---|---|
2024年11月25日 | -- | -- | 英语 (English) 中文 |
Published date: 25 November 2024
Open early engagement - This means that a procurement idea is currently active, it is in the early stage of development and judging interest from potential suppliers.
Ground-stabilisation work - 45111230
HR9 6BW
CRML0001 - Expression of interest - Herefordshire Drag Road
25 November 2024
6 December 2024
Yes
No
Balfour Beatty on behalf of the client Herefordshire Council require a subcontractor who can provide a proposed soft nails solution (soil nailing) .
Background:
In December 2023, an inspection of Drag Road Byway, Symonds Yat, found that there had been movement of the embankment causing the road to move, which is a safety concern. A full emergency closure of this section was put in place.
Site visits from geotechnical specialists and topographical surveys confirmed that a failure had occurred within the slope below the concrete edge beam/retaining structure that forms the edge of the highway towards its northern end of the structure. This failure appears to have been constrained by the low point within the crest of rock out crop below Drag Road. As a result of the failure a width of approximately 4.75m of the underside of the edge beam/retaining structure has been exposed
Proposed solution: Soil nails as per draft drawings.
The location and roads around Symonds Yat are very narrow 2.5-3m wide in places. This will need small specialist equipment to undertake the works.
If interested in this package of works, please contact Elisabeth Wyllie.
Email: elisabeth.wyllie@balfourbeatty.com
Attachments
Follow the instructions given in the description or the more information section.
Elisabeth Wyllie
5 Churchill Place
LONDON
RG238BG
England
07922 100358
Is there anything wrong with this page?
上一篇:
Southwater Tree Survey (Nov 2024) Identified Works - Tranche 1下一篇:
AMÉNAGEMENTS D'UN CARREFOUR GIRATOIRE RUES PRINCIPALE, DES GRANDES VIGNES ET AVENUE DE TOURAINE - VEIGNE (37)猜你喜欢
加载中...
广告