Published date: 27 March 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Transport equipment and auxiliary products to transportation - 34000000
Construction work - 45000000
Installation services (except software) - 51000000
CB2 1TW
£40,000 to £50,000
CCC001-DN717469-99569183
27 March 2024
10 May 2024
12pm
28 June 2024
27 June 2027
Service contract
Other
Yes
No
The Council invites quotations for the provision of Supply & installation of Rising bollards (two) with signal & access card cabinet at St Johns Street, Cambridge. To include a signal cabinet with the associated electrics & access card system. The access card system from the current measures that is still in working order to be incorporated into the new measures. To also provide the ability that an authorised officer at Cambridgeshire County Council can lower the bollard with manual switches or other means within the signal cabinet. Arrangements for maintenance in a timely manner if the bollard & associated mechanics malfunction.
The current rising bollard at St Johns Street has not been functional for some time & requires replacement.
The below details illustrate for quotation purposes the requirements for the replacement system:
• A replacement of current system - like for like, non-rated system.
• A swipe card system to allow permittable individuals / vehicles to gain access through the bollard.
o The current swipe card system is mounted to a cabinet & still works (does not need to be replaced - to be accommodated within new system).
o There is currently a separate traffic light post.
• A loop/s in the road & proximity controllers which detect the presence of permittable vehicles fitted with transponders.
o Loop system to detect vehicles is required - appropriate for a one way street.
• The cabinet housing heating and cooling mechanisms & signal head.
o It is understood that the current system includes a heating & cooling mechanism.
o Signal head - traffic light system.
Project Overview
• Removal of current measures.
• Civils - removal of paving & others to be able to remove current measures.
• Installation of new measures.
• Civils - reinstallation of paving & others to make good to bring area back to business as usual.
• Site management.
• 3 years maintenance of measures with 12 month extension option
Follow the instructions given in the description or the more information section.
New Shire Hall
Alconbury Weald
Huntingdon
PE28 4YE
England
Ian.Gower@cambridgeshire.gov.uk
上一篇:
Provision of energy consultancy service for void properties managed by Birmingham City Council下一篇:
Maîtrise d'oeuvre relative à la réhabilitation de 12 logements collectifs - 1 et 2 rue Ouvrage de Villy - 55700 STENAY猜你喜欢
加载中...
广告