Published date: 21 March 2025
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Transport equipment and auxiliary products to transportation - 34000000
Construction work - 45000000
England
£1
CAMBDC001-DN768636-67033590
21 March 2025
11 April 2025
12pm
1 May 2025
1 August 2025
Works
Open procedure (below threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements below the relevant contract value threshold.
Yes
No
Cambridge City Council (CCC) is enhancing the public cycle parking at the Queen Anne Terrace (QAT) multi-story car park on Gonville Place in central Cambridge. The cycle parking at QAT addresses a strong local need due to its proximity to key facilities, including businesses, leisure and shopping areas, hospitality venues, green open spaces, and other amenities. Recreational and sports facilities are also available on site.
The proposed improvements include additional cycle parking spaces and enhancements to safety, security, and accessibility. There are two cycle parking areas at QAT: one inside the car park building and the other outside, which is not covered. Both are at street level. There is a demand for safe, secure, and accessible short-term and long-term cycle parking.
In the undercover cycle parking area, CCC plans to remove all existing cycle stands and ground anchors, adjust fence lines, and screed the floor before installing new cycle stands in a 'toast-rack' setup (consisting of two or more cycle stands securely attached to horizontal steel sections), cargo cycle parking bays with new ground anchors, and signage. An access-controlled area is also proposed, which will require a swing gate fitted with mag locks.
For the external cycle parking area, CCC proposes to remove all existing vegetation, including a semi-mature tree, and all existing cycle stands and concrete hardstanding. The area will then be excavated to install an engineered tree pit with a hardstanding area above, and new root-fixed cycle stands (each stand leg embedded into a concrete foundation).
New trees will be planted after the works are complete.
Follow the instructions given in the description or the more information section.
Jonathan Loneza
Cambridge City Council
Guildhall
Cambridge
CB2 3QJ
United Kingdom
+44 1223457107