加载中...
广告
发布时间 | 所属地区 | 所属机构 | 语言 |
---|---|---|---|
2024年08月13日 | -- | -- | 英语 (English) 中文 |
Published date: 13 August 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Designs - 22314000
Apparatus and equipment designed for demonstrational purposes - 39294000
Engineering design services for the construction of civil engineering works - 71322000
Load-bearing structure design services - 71327000
Verification of load-bearing structure design services - 71328000
Design consultancy services - 79415200
London
£50,000 to £100,000
C4N84154543
13 August 2024
16 August 2024
12pm
4 November 2024
30 June 2026
Service contract
No
No
Kilnbridge have secured the HS2 Old Oak Common Station Works Packages WP13.1 Urban Realm Civils, Utilities and Earthworks and WP10.2 Ancillary Buildings. The scope of works involves the design of permanent and temporary works which will require CAT3 checks. Below is a non-exhaustive list of the design items under consideration:
• Precast concrete buildings
• Structural Steel a
• Façade systems
• Cofferdams (TW)
• Fencing (TW) in proximity to TFL & Network Rail assets
• Formwork (TW) in proximity to TFL & Network Rail assets
• Crane working platforms (TW) in proximity to TFL & Network Rail assets
The subcontractor will be expected to adhere to HS2/BBVS Design, Technical Assurance, & Information exchange procedures when producing calculation packs and any other check output documents.
The checks will take place over a 3-year period starting at the beginning of Q4 2024.
Links
Follow the instructions given in the description or the more information section.
Clare Llewellyn
McDermott House, South Crescent
London
E164TL
UK
07933529243
Is there anything wrong with this page?
上一篇:
Sustainable Environmental Regulatory and Digital Solutions (SERDS)下一篇:
PQ0543 - Fast-Track Cities Plus (FTC+) Know Your Status Marketing Campaign猜你喜欢
加载中...
广告