加载中...
广告
发布时间 | 所属地区 | 所属机构 | 语言 |
---|---|---|---|
2025年02月21日 | -- | -- | 英语 (English) 中文 |
Published date: 21 February 2025
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Installation services (except software) - 51000000
Environmental services - 90700000
South East
£927,000
RBWMEV2025
21 February 2025
1 May 2025
1pm
1 September 2025
31 August 2040
Service contract
Open procedure (above threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements above the relevant contract value threshold.
Yes
No
RBWM has been awarded Local Electric Vehicle Infrastructure (LEVI) funding from the Department for Transport. The purpose of this funding is to support new concession contracts for on-street charging within RBWM. RBWM has decided to divide this funding into two equal amounts, each to support one of two new area-based concession contracts in the borough. These contracts will be awarded through a single procurement, each contract to be won by a different supplier.
As concession contracts, the borough is looking to partner with chargepoint operators that will bring in significant private investment of their own throughout the life of the contract to provide charging solutions for residents across their concession area. Private investment should very substantially exceed the value of the grant funding. The Chargepoint Operator will be responsible for securing overall funding and financing for their capital investment and will need to provide suitable assurance within their bid of suitable funding and financing arrangements for the chargepoint sites that they commit to deliver.
The purpose of the grant funding is to accelerate wider private investment in an on-street charging network - ensuring chargepoints are in place ahead of time ready to meet and further induce growing demand. The LEVI capital funding will contribute towards the cost of:
Chargepoint hardware
Chargepoint installation
Upgraded or new grid connections, including the local connection from feeder pillar to charging assets
Works to the highway to reconfigure existing or create new parking spaces and/or parking restrictions, including but not limited to signs and lining
Introducing or amending Traffic Regulation Orders or parking restrictions
Licenses, approvals, permits, and local authority planning fees relating to installation (where needed)
Links
Follow the instructions given in the description or the more information section.
Lyn Hitchinson
Town Hall
MAIDENHEAD
SL61RF
England
01628796285
Is there anything wrong with this page?
上一篇:
tNCEA England Ecosystem Survey Soil Sampling and Assessment Survey 2025-26下一篇:
Humber Bridge Board - Road Deck Resurfacing Maintenance猜你喜欢
加载中...
广告