Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Racking - 39151100
SW7 2DD
£0 to £100,000
IT-492-1388-SCM3373M
14 June 2024
28 June 2024
5pm
1 August 2024
31 July 2027
Service contract
Open procedure (below threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements below the relevant contract value threshold.
Yes
No
SMG wishes to appoint a supplier for inspection of racking and shelving. The company should be an approved SEMA (Storage Equipment Manufacturers Association) inspector or SARI. The inspections will be required at all the sites within SMG.
The below definition explains what SMG considers to be racking:
o Any type of framework of fixed or adjustable design which supports a load without the use of shelves (e.g., pallet racking)
o Contains mechanical components/moving parts in the storage system (mechanical racking).
o Stillages
All other storage systems may be considered shelving or bookshelves.
To ensure certain types of shelving are suitable for purpose, SMG have also deemed there to be a category of enhanced inspection shelving. This shelving is defined as:
o Shelving which supports loads whereby one person could not comfortably lift the loads without assistance (based on manual handling guidelines) or the use of equipment such as ladders.
o Extensive large shelving which supports a lot of material/stock
The service should be on an annual basis unless the inspection results dictate otherwise.
The appointed supplier will undertake a full asset verification during the first visit to each location, and throughout the contract, maintain an up-to-date asset list, adding and removing items as required. Access to the asset list, inspection reports, recommendations etc via a web portal/electronic system.
The supplier should be independent from any racking manufacturer and be able to inspect all the types of racking as outlined above.
The inspection should include all elements required under the relevant legislation, SEMA guidelines and best practices. In addition, identify if and where safe working load or SEMA notices are required, check existing signage for correct details and locations. Where the safe working load notices are missing, or the racking is historic in nature the safe load must be determined and notified to SMG.
Where defects are noticed during the inspection the report must highlight this along with a time period for the repair. Any defects leading to serious safety risk should be notified to the local Estates Team immediately along with the required actions. Where defects are noted, a quote should follow to undertake the repairs. SMG will not be obliged to act on this quote.
Some of the SMG sites are very large with asset locates across different buildings and numerous floors, the time and to travel within the site must be included.
Access to site will be facilitated by the local Estates Team, and all site attendance must be coordinated through them. The inspections will take place during normal business hours 07.00 - 19.00. Public areas are to be inspected outside of museum operational hours of 10.00 - 18.00. To enable this, a program needs to be developed for the inspections at each site. There must be flexibility for events, breakdowns, maintenance etc within the program as an ...
Links
Additional text
You can view our tender documents and apply for the opportunity here: https://in-tendhost.co.uk/sciencemuseumgroup/aspx/Home
Is a Recurrent Procurement Type? : No
Follow the instructions given in the description or the more information section.
Orla Gardner
Exhibition Road
South Kensington
London
SW7 2DD
United Kingdom
02079424000
Orla.Gardner@Railwaymuseum.org.uk
Is there anything wrong with this page?
上一篇:
CCTV-Installation, Repair and Maintenance- Corporate Housing下一篇:
PRP261 Doveridge Primary School - Replacement Flooring猜你喜欢
加载中...
广告