加载中...
广告
发布时间 | 所属地区 | 所属机构 | 语言 |
---|---|---|---|
2024年07月03日 | -- | -- | 英语 (English) 中文 |
Published date: 3 July 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Industrial process control equipment and remote-control equipment - 38800000
Nuclear evaluation instruments - 38940000
Any region
£0 to £25,000,000
20240703170737-72814
3 July 2024
12 August 2024
12pm
18 November 2024
17 November 2027
Supply contract
Open procedure
Any interested supplier may submit a tender in response to an opportunity notice.
Yes
No
The manufacture, supply, and commissioning of a neutron source and supply of ancillary systems including, but not limited to cooling systems, power supplies, tritium handling (if required) and other control systems with the best available output (source strength and operational availability) that is capable of allowing tritium breeding mock-ups to be exposed to 14.1 MeV neutrons. The Neutron Source shall have proven operational availability (creating 14MeV neutrons) of at least 500 hours per annum to facilitate the LIBRTI experimental programme. The Equipment supplied to the Client shall be based upon existing products capable of being delivered within 24 months from point of contract award.
In parallel with the development of a baseline system stated above the Contractor shall commit to support the Client in a collaborative endeavour to develop an upgrade solution of the baseline system to increase its output and thereby target exposure fluxes of 1013 n/cm2/s. The contractor may wish to take on the full development programme but as a minimum, shall ensure that the baseline system can be updated with a retrofit and that the Contractor will supply drawings and technical information adequate to supporting an upgrade. The development of the upgrade shall be centred around the assumption of it being deployable as an on-site modification of the existing Client baseline installation. The R&D programme described above shall be completed within 36 months from contract award.
Finally, the Contractor shall enable successful operational use of the neutron source by the Client through the provision of both training and maintenance of the delivered systems. The contractor shall provide a maintenance service provision from point of delivery to the Client and will include the provision for both planned and unplanned maintenance tasks supported by a Service Level Agreement
Links
Follow the instructions given in the description or the more information section.
Carl Evans
Culham Campus
Abingdon
OX14 3DB
ENG
www.gov.uk/government/organisations/uk-atomic-energy-authority
Is there anything wrong with this page?
上一篇:
Keyholding, Lock and Unlock and Call Out Services - Bessie Surtees House, Newcastle下一篇:
GB-London: Video Interview Platform for LGA Graduate Programmes猜你喜欢
加载中...
广告