加载中...
广告
发布时间 | 所属地区 | 所属机构 | 语言 |
---|---|---|---|
2024年07月25日 | -- | -- | 英语 (English) 中文 |
Published date: 25 July 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Bridge construction work - 45221110
Boardwalk construction work - 45246510
SL9 9QX
£0 to £100,000
CSP - Bridge and Boardwalk
25 July 2024
16 August 2024
11am
1 October 2024
31 March 2025
Works
Open procedure (above threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements above the relevant contract value threshold.
Yes
Yes
Tenders are invited for the design, supply and installation of a 1.2m wide recycled plastic 6m long pedestrian bridge and 63lin m boardwalk together with foundations, handrails and all necessary fittings and fixings.
Tenderers are welcome to propose alternatives to the following specification based on their own expertise and experience but must describe any variation from it.
Specification
Design Load: The bridge and boardwalk shall be designed for a live pedestrian load not less than 4kn/m2.
Material: The bridge and boardwalk shall be fabricated from recycled plastic components. The colour shall be uniform black or dark grey.
Metal fixings shall be galvanised or stainless steel.
Bridge Access: On the west side, access to the bridge shall be via a short ramp from road level approx. 1.8 m wide with slope not exceeding 1 in 12 surfaced with bound gravel.
Bridge Foundations: It is envisaged that the bridge foundations will comprise lightly reinforced insitu concrete beams cast on top of 2No 200mm diameter recycled plastic piles 3m long but tenderers should describe their own proposals and note that design responsibility for fitness for purpose will rest with the contractor. The west side foundation shall be higher than the east by 0.5m providing a 1:12 fall across the bridge. Boardwalk Foundations shall be recycled plastic posts suitably bedded into the ground. Bridge & Boardwalk shall be 1.2m wide. There shall be a 4.5m long x 1.2m wide passing platform at midpoint of the boardwalk. There shall be 1.2m wide ramps from boardwalk to ground with slope not exceeding 1 in 12 on either side at 7.5m from the east bridge abutment.
The bridge and first section of the boardwalk only - i.e. 7.5m to the ramps - shall have double handrail.
Kickboards should not be provided but bridge and boardwalk shall have wheelchair edge guides on both sides.
Layout of the bridge and boardwalk is indicated on the attached 2 sketches but subject to final agreement.
Applications will be received by email to clerk@chalfontstpeter-pc.gov.uk no later than 11am on Friday 16th August 2024.
Attachments
Links
Follow the instructions given in the description or the more information section.
Debbie Evans
Gravel Hill,Chalfont St. Peter
GERRARDS CROSS
SL99QX
England
07805615228
clerk@chalfontstpeter-pc.gov.uk
Is there anything wrong with this page?
上一篇:
L24068-T-LH Consultancy Support to Air Navigation Services Provision (ANSP) Tender下一篇:
STC - Mainstream and Out of County猜你喜欢
加载中...
广告