五洲招标网

五洲招标网
首页 > 英国 > Platinum Plott

加载中...

广告

Platinum Plott

发布时间 所属地区 所属机构 语言
2024年04月24日 -- -- 英语 (English) 中文
抱歉,该信息暂无中文翻译信息,为您显示项目原文信息。

Published date: 19 April 2024

Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.

Closing: 6 May 2024, 5pm

Contract summary

Industry

  • Earthmoving work - 45112500

  • Landscaping work for green areas - 45112710

  • Landscaping work for parks - 45112711

  • Landscaping work for gardens - 45112712

  • Siteworks - 45113000

  • Location of contract

    CV23 9HL

    Value of contract

    £22,000 to £35,000

    Procurement reference

    SoDPC - 001

    Published date

    19 April 2024

    Closing date

    6 May 2024

    Closing time

    5pm

    Contract start date

    30 June 2024

    Contract end date

    31 October 2024

    Contract type

    Works

    Procedure type

    Competitive quotation (below threshold)

    The buyer selects a group of potential suppliers to invite to tender.

    This procedure can be used for procurements below the relevant contract value threshold.

    Contract is suitable for SMEs?

    Yes

    Contract is suitable for VCSEs?

    No


    Description

    1. To install medium duty footway along the line of the provided plan including:
    a. Ease gradients along the path line
    b. Dig out topsoil to minimum 200mm and form gently sweeping path
    minimum 1200mm wide (approx. 250m long) Store onsite for re-use.
    c. Form circle path designs as per plan and on-site discussions
    d. Lay weed control fabric along path base
    e. Supply, lay and compact suitable hard filling for path [non-recycled Type 1
    stone or similar] to form the path base to within 50mm of finished surface.
    f. Supply, lay, roll and compact suitable gravel/stone dressing layer to provide
    a stable, even path surface. [For example; self-binding 'Breedon' gravel or
    tarmac road planings - please specify in the quote.]
    2. To Install wooden edgings along entire length of new pathway.
    3. Build steps using treated wooden oak sleepers as per plan, each step down to be
    laid on a lean dry mix foundation no less than 100mm deep. Where tread width
    exceeds sleeper width remaining area of tread to be gravel/stone filled. [For
    example; self-binding 'Breedon' gravel or tarmac road planings - please specify in
    the quote.]
    4. Car Park Area: Supply and install pedestrian / access gate [approx. 12ft wide] to
    fenced area and make good / repair fence either side. Gate should be same height /
    type as the existing "orchard/burial ground" pedestrian gate. Create Bund for future
    planting of hedge either side of gate.


    More information

    Attachments

  • Schedule of Works for Plott Paths_v3.0 131223 (1).pdf
  • Technical specifications
  • Scope of Work
  • Platinum Plott Car Park Diagram.pdf
  • Illustrations
  • Drawing 1
  • Platinum Plott Path Diagram.pdf
  • Illustrations
  • Drawing of proposed pathways

  • How to apply

    Follow the instructions given in the description or the more information section.


    About the buyer

    Contact name

    MRS HELEN E STEWART

    Address

    3 Orchard Way
    Stretton on Dunsmore
    Rugby
    CV239HP
    United Kingdom

    Telephone

    07870314001

    Email

    strettonondunsmoreclerk@gmail.com


    Share this notice

    温馨提示:本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
    如果您对这篇招标信息有任何补充或修改建议,请告知我们。

    猜你喜欢

    加载中...

    广告