加载中...
广告
发布时间 | 所属地区 | 所属机构 | 语言 |
---|---|---|---|
2024年10月08日 | -- | -- | 英语 (English) 中文 |
Published date: 8 October 2024
Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.
Electricity, heating, solar and nuclear energy - 09300000
Construction work - 45000000
PL6 7TR
£100,000 to £150,000
bick1024
8 October 2024
22 October 2024
5pm
1 March 2025
1 October 2025
Works
Open procedure (above threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements above the relevant contract value threshold.
Yes
Yes
Bickleigh Parish Council invite you to submit a TENDER for the design, installation and handover of the new MEP services as per the below and supporting information.
General Scope of works to be completed:
Upgrade as required plantroom equipment excluding pipework unless it is deemed not fit for purpose. (note existing boilers to be retained)
The existing building management system will be upgraded with a new control panel which will control the existing AHU within the hall along with the new plant and heating zone valves.
Areas to have suitable space temperature sensors, all TRV's to be removed as there will be no requirement for them.
Removal of all electric radiators and replacement with a suitably sized panel radiator.
A new touch screen control panel located behind the reception desk which will allow for the Woolwell Centre team to control the building in zones, rather than having to activate the entire system.
12 month defects liability period.
Your tender is to include for all design work necessary to complete the works.
Acceptable to utilise plastic or pipe for ease of installation as the existing heating system is iron pipework.
Allow for all builders works in connection including making good of all building fabric
along with creating boxings to hide any exposed services.
Allowance for all penetrations to be adequately fire stopped and certified by a suitablycompetent and qualified business.
Existing "heat only boiler" to be relocated within the plantroom to feed a new cylinder for the domestics which will allow for the removal of the gas fire clarofier.
Domestic pipework to be re-configured as required to ensure that the entire building is now on 1 domestic system suitable PoU water heaters are acceptable. (NOT over sink units)
Taps where required to be replaced with concussion taps and TMV's.
Design fee to be allowed for to generate a stage 5 package of construction information including a contractors proposal for acceptable by the BPC.
Tender Summary Presentation:
1. MEP Design.
2. Preliminaries.
3. Heating adaptions.
4. Demolition and alterations.
5. Local cooling replacements.
6. Domestic systems modifications.
7. BMS Control system.
8. Operations and Maintenance Manuals.
9. Commissioning
10. Chlorination & Inhibitor works.
11. Pipe Work insulation.
12. Electrical Works
a. New DB for mech power supplies.
b. Mechanical Wiring.
The successful contractor is to be responsible for the application for and compliance with the prevailing Building Regulations applicable to the work.
The contractor is to allow for all updates and amendments to the Building Operations and Maintenance Manual.
Where applicable, the contractor is to act as Principal Contractor for the works and is responsible for complying with all aspects of the Construction Design and Management Regulations 2015
FURTHER INFORMATION IS AVAILABLE FROM parishclerk@bickleigh.gov.uk
Follow the instructions given in the description or the more information section.
Helen Broughton
The Woolwell Centre Darklake Lane
Plymouth
PL67TR
England
07832966859
Is there anything wrong with this page?
上一篇:
Electric 2500kg forklift truck with rotator forks下一篇:
Supply, Installation and Maintenance of CCTV猜你喜欢
加载中...
广告