MMIC BMS and EMS Annual Maintenance and Validation

发布时间 所属地区 所属机构 语言
2024年03月28日 -- -- 英语 (English) 中文
抱歉,该信息暂无中文翻译信息,为您显示项目原文信息。

Published date: 27 March 2024

Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.

Closing: 12 April 2024, 12pm

Contract summary

Industry

  • Electrical machinery, apparatus, equipment and consumables; lighting - 31000000

  • Building services consultancy services - 71315210

  • Location of contract

    TS104RF

    Value of contract

    £0

    Procurement reference

    IT-540-71-3079

    Published date

    27 March 2024

    Closing date

    12 April 2024

    Closing time

    12pm

    Contract start date

    6 May 2024

    Contract end date

    5 May 2028

    Contract type

    Service contract

    Procedure type

    Open procedure (below threshold)

    Any interested supplier may submit a tender in response to an opportunity notice.

    This procedure can be used for procurements below the relevant contract value threshold.

    Contract is suitable for SMEs?

    Yes

    Contract is suitable for VCSEs?

    No


    Description

    The BMS and EMS system currently runs on Siemens Desigo CC and the facility is on the course to being a fully GMP compliant facility. There are currently ten BMS panels on the site with several sensors and control points that feed into these panels from various cleanroom and plant equipment.
    Our EMS and BMS systems both use the same sensors for control and monitoring but operate slightly differently. Our EMS system is fully audit trailed and validated yearly to keep this in line with GMP requirements. The EMS monitors all data coming from our clean rooms which monitors the temperature, humidity, airflow, and differential pressure across all four cleanrooms, service corridors and auxiliary areas.
    On site we currently have the below equipment and system checks required to be covered under the service agreement
    o 4 cleanrooms all fitted with 2 control panels, 4 differential pressure probes along with a temperature and humidity sensor. Each it will need to be fully calibrated annually along with all calibration reports provided.
    o We currently have 11 air handlers in total, 5 of these feed into our cleanroom areas while the other 6 units feed into control offices and event areas. All units have 2 fan speed controllers, 7 pressure transmitters, 1 fresh air temperature sensor, 3 temperature humidity sensors and 2 velocity meters. All of which require to be calibrated annually along with calibration reports.
    o Differential pressure switches that will need to be inspected to ensure the electrical operation of the circuit is running as it should.
    o As well as this, the switch setting must be checked, and you must ensure that it responds to changes in pressure.
    o Air and water flow switches that will need to be inspected to ensure the electrical operation of the circuit is running as it should. The switch setting must be checked to ensure that it responds to change in flow. Actuators/Valves/Dampers/Water Meters- Check the operation of actuators across their full stroke and ensure correct positioning over the analogue output range. Ensure actuator limit switches operate correctly along with Check power fail action operates correctly by simulating mains failure. Check valves for leaks and repair where applicable and ensure minimum let-by in the closed position. Check that the valve and damper linkage are fitted securely. Check that damper blades and linkage operates operate correctly throughout their range, without undue stiffness. Advise relevant Building Services Engineer of any mechanical problems.
    o Control Checks - Check the stability of all plant visually along with System Operation Checks. Authorisation will be sought from a member of the CPI operational Engineering team prior to isolating any plant, and care will be taken that any checks do not unduly affect environmental conditions. The system will be set to its 'off' condition (where possible) and check correct response of all controlled equipment. Along with Simu...


    More information

    Links

  • https://in-tendhost.co.uk/uk-cpi/aspx/
  • Additional information on how to apply for this contract
  • Additional text

    For more information please see the tender documentation, that is free to access on https://in-tendhost.co.uk/uk-cpi/

    Is a Recurrent Procurement Type? : No


    How to apply

    Follow the instructions given in the description or the more information section.


    About the buyer

    Contact name

    Daisy Irving

    Address

    Wilton Centre
    Wilton
    REDCAR
    TS104RF
    United Kingdom

    Telephone

    +44 01740625716

    Email

    daisy.irving@uk-cpi.com


    Share this notice

    温馨提示:本网站为您提供准确和及时的招投标信息,但招投标信息存在着变更的可能,请您务必在交易前向招标代理机构或招标人咨询投标详细要求,有关招标的具体要求及情况以招标代理机构或招标人的解释为准。
    如果您对这篇招标信息有任何补充或修改建议,请告知我们。

    猜你喜欢

    加载中...

    广告